The difference between cold-rolled steel and hot-rolled steel is not in the smelting process, but in the rolling temperature, or the termination temperature of rolling. The finish rolling temperature lower than the recrystallization temperature of the steel becomes cold rolled steel. Hot-rolled steel is easy to roll and has high rolling efficiency, but the steel is oxidized under hot-rolled conditions, and the surface of the product is black and gray. Cold-rolled steel requires high mill power and low rolling efficiency, and intermediate annealing is required to eliminate work hardening during the rolling process, so the cost is also high, but cold-rolled steel has a bright surface and good quality, and can be directly used for processing Finished products, so cold-rolled steel sheets are widely used.
WSS-M1A365-A14 CR4 is cold rolled automotive coil to Ford, grade 4
Solucky steel Limited is a third-party supply chain service enterprise focusing on materials for automobiles, high-end household appliances, as well as material processing and storage. Its headquarters and warehouse base are set up in Shanghai BaoShan, and has branches all over the country, 20+ subsidiary companies,including Foshan, Guangdong, Chongqing, Wuxi, etcz.
Composition and Properties
The material |
WSS-M1A365-A14 CR4 |
Chemical composition |
C |
Si |
Mn |
P |
S |
Al |
Ti |
Cu |
|
≤ 0,06 |
≤ 0,50 |
≤ 0,40 |
≤ 0,025 |
≤ 0,020 |
≥ 0,010 |
≤ 0,30 |
≤ 0,20 |
Mechanical properties of |
YS |
TS(MPa) |
EL |
n |
r |
|
|
|
|
140-180 |
270-330 |
≥40 |
≥0.20 |
≥1.6 |
|
|
|
Main products
Cold Rolled |
Hot Rolled |
Electro Galvanized |
Aluminum |
Stainless Steel |
Pickling Plate |
Tinplate |
Electrical Steel |
Product Application
Machines & Processing
Packing & Delivery & logistics
Why Choose Us
FAQ
1.Where is your factory?
Our head office and warehouse located in Shanghai--the biggest steel making center of China
2.How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
3.What about the MOQ?
MOQ only 200KG,include coils and sheets
4. How long is your lead time?
In general, our delivery time is within 7-15 days, and may be longer if the quantity is extremely large or special circumstances occur.
5.How's your product quality?
We only sell mid to high end steel materials,100% quality guarantee and cost-effective.
6.What are your terms of payment?
You can make the payment to our bank account,T/T, 30% deposit in advance, 70% balance against the copy of B/L.
7.How many countries you already exported to?
We have exported to America, Canada, Brazil, Chile, Colombia, Russia, Ukraine, Thailand, Myanmar, Vietnam, India, Kenya, Ghana,somalia and other African countries.Our export experience is rich, we familiar with different market demands, can help customers avoid a lot of trouble.
8.What are the certifications for your products?
We have ISO 9001, MTC, third parties' inspections are all available such SGS, BV ect.