cold rolled steel
Cold-rolled steel is steel produced by cold rolling. Cold rolling is a steel plate obtained by further rolling the No. 1 steel plate to a target thickness at room temperature. Compared with hot-rolled steel sheets, cold-rolled steel sheets have more accurate thickness, smooth and beautiful surface, and also have various superior mechanical properties, especially in terms of processing performance. Because cold-rolled raw coils are relatively brittle and hard, they are not suitable for processing, so usually cold-rolled steel sheets are required to be annealed, pickled and surface-leveled before being delivered to customers. The maximum thickness of cold rolling is below 0.1--8.0MM. For example, the thickness of cold-rolled steel sheets in most factories is below 4.5MM; the minimum thickness and width are determined according to the equipment capacity of each factory and market demand.
Solucky steel Limited is a third-party supply chain service enterprise focusing on materials for automobiles, high-end household appliances, as well as material processing and storage. Its headquarters and warehouse base are set up in Shanghai BaoShan, and has branches all over the country, 20+ subsidiary companies,including Foshan, Guangdong, Chongqing, Wuxi, etcz.
Composition and Properties
The material |
VDA 239-100 CR210LA |
Chemical composition |
C% |
Si% |
Mn% |
P% |
S% |
Al% |
Ti% |
Nb% |
|
≤0.10 |
≤0.50 |
≤1.00 |
≤0.08 |
≤0.03 |
≥0.015 |
≤0.15 |
≤0.10 |
Mechanical property |
YS |
TS(MPa) |
EL(%) |
n |
|
|
|
|
|
210-300 |
310-400 |
≥29 |
≥0.15 |
|
|
|
|
Main products
Cold Rolled |
Hot Rolled |
Electro Galvanized |
Aluminum |
Stainless Steel |
Pickling Plate |
Tinplate |
Electrical Steel |
Product Application
Machines & Processing
Packing & Delivery & logistics
Why Choose Us
FAQ
1.Where is your factory?
Our head office and warehouse located in Shanghai--the biggest steel making center of China
2.How long is your delivery time?
Generally it is 5-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
3.What about the MOQ?
MOQ only 200KG,include coils and sheets
4. How long is your lead time?
In general, our delivery time is within 7-15 days, and may be longer if the quantity is extremely large or special circumstances occur.
5.How's your product quality?
We only sell mid to high end steel materials,100% quality guarantee and cost-effective.
6.What are your terms of payment?
You can make the payment to our bank account,T/T, 30% deposit in advance, 70% balance against the copy of B/L.
7.How many countries you already exported to?
We have exported to America, Canada, Brazil, Chile, Colombia, Russia, Ukraine, Thailand, Myanmar, Vietnam, India, Kenya, Ghana,somalia and other African countries.Our export experience is rich, we familiar with different market demands, can help customers avoid a lot of trouble.
8.What are the certifications for your products?
We have ISO 9001, MTC, third parties' inspections are all available such SGS, BV ect.